Hydronic Heating 5 Step Design Process

Step 1 - Architectural Plan Review
The first step in the radiant floor design process is to review the architectural plans including window and door schedules and associated thermal properties of walls, windows and ceilings. A site visit is necessary for a retrofitted system on an existing structure. The most suitable location for the system, the components, and the zoning options will be determined.

Step 2 - Heat Loss Analysis
Based upon the architectural plans, schedules, and R-values of walls and ceilings a Heat Loss Analysis of the structure will be calculated. The Heat Loss Analysis determines the overall heat load, the size of the boiler, and how much heat is needed in each area of the structure.

Step 3 - Select System Components

Select the Heat Source or Combination of Sources

  • High Efficiency Boiler
  • Wood Boiler
  • Solar Hot Water System

Select the Delivery System or Combination of Systems

  • Radiant Floor Piping
  • Hot Water Baseboard
  • Hydronic Air Handlers
  • Domestic Hot Water (Indirect or On-Demand)

VersaCorStep 4 - Specify VersaCor Distribution System

  • Single Temperature
  • Two Temperature
  • Three Temperature
  • Custom Design

Step 5 - Detailed Design, Estimate and Review
Sundance will provide a customized detailed design and estimate of the project components and installation based upon the particulars of the design constraints.